ANTWERP SCHELDEBOORDEN
Antwerp, Belgium
Antwerp, Belgium
The dike of the left bank of the Scheldt needs to be raised because of rising water levels. These infrastructural works become the opportunity to rethink the left bank as a linear park of more 7km. The park allocates more space to both nature and recreation, connected by continuous meandering pathways.
Year: 2021 – 2027
Client: City of Antwerp
Design Team: : ARA, AGT, Plant&Houtgoed, Grau, Billie Bonkers, Vectris, Rebelgroup, Equator